Access Innovations Global

#1 Global Mining Access Systems

Home | About Us | Systems Ready for Shipping | Safety & Mining | Projects | Testimonials | Contact Us

Scrapers
 - Scrapers
- Excavators

  Workshop Access
- Workshop Access
- Strut Access
  Graders- 12H 14H Mini-Side Access
- 16H Mini-Side-Access
- 24H Mini-Side Access
- 24M Mini-Side Access
- 16M Gallery
- Full Access Systems
- 24H/M 825 16M 16G/H
Dozers- CAT D11 Dozers
- D6T Dozer
- D8 D9 D10 Dozer
- CAT D10T Dozer
- CAT D7, D8,D9,D10 D11
- Around Cab Access
- Front Deck System
 

Mining & Forrestry
- Engine Bay - Front Access
- 12G 12H 14G 14H

   
 

Access Innovations provides engineering solutions for projects Australia wide.

Access Innovations Engineering Solutions was a major Sub-contractor to BMDe3's 2009 $23m Tarong Power Station Ash Disposal System Construction.

This involved the building of 4.2 kms of dual pipeline from the Ash Dam to a mixing tank thickening plant which then pumped it into a mine void. The scope of work undertaken comprised the following:

  • pipe supports
  • walkways and handrails
  • plant support structures
  • main control room refurbishment
  • overhead beams and computer stands
  • on-site labour
  • industrial painting and transport support

This project was completed and commissioned ahead of schedule with all stakeholders happy with the quality of the safety, workmanship and communication through the project.

Access Innovations Engineering Solutions is available for all power station, pipelines and gas infra structure projects and support. Call us on 07 4162 2055. We would be happy to discuss your work.

 



 
 

Recent work completed by
Access Innovations Engineering Solutions.

Tarong Power Station

Power Station & Gas Infrastructure Support

Mixing tank and gantry structure

Tarong Power Station

Mixing tank and gantry structure

Tarong Power Station

Plant access walkways